Simulation of corrections
The first measurement of the trimming is carried out and interventions are planned to correct it. The tolerance given by the certification (+/- 10 mm) dates from the…
How is a TRIMMING carried out?
This is the adjustment of the line, which must be close to the factory data and the homologation.
The first measurement of the trimming is carried out and interventions are planned to correct it. The tolerance given by the certification (+/- 10 mm) dates from the…
This involves measuring the ‘total lengths’ of lines, from the base of the risers to the lower surface. This thus takes into account all the manufacturing deviations of…
We intervene in different ways to put things back on track. At the beginning of paragliding, there were 5 to 6 lines per row on each side. We…
Once the corrections have been made, we write a calibration report showing